Griddle – Parkcenter Blvd.

The Griddle– where whipped cream comes on top of everything. Join us for a beautiful morning run on the Greenbelt from the Griddle on Parkcenter. We meet in the parking lot to the left of the restaurant. After you burn off a few calories join us for coffee or breakfast!

  • DETOUR – While Broadway Bridge is closed, we will need to detour all Greenbelt runs around the construction. The alternate route adds 0.5 miles to each route.
  • 3 mile – Make your way through the parking lot to the Greenbelt. Turn right and head southeast along the Boise River toward the Parkcenter bridge. This is an out and back run.
  • 5 mile – On the Greenbelt, head southeast along the Boise River toward the Parkcenter bridge. Turn left and cross the bridge, continuing 0.1 mile past the bridge until you see the Greenbelt. Turn left and head northwest along Warm Spring Ave. until reaching the red bridge at the golf course. Cross this bridge and turn left, you are almost back at the Griddle now.
  • 7 mile – This is the same route as the 5-mile route above but continue past Parkcenter bridge to South Eckert bridge.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s